What to do after the diesel generator set is shut down?

Source: Time:2022-05-27 10:25:41 views:

After the shutdown of the diesel generator set, it is also necessary to carry out the following work


After the shutdown of the diesel generator set, it is also necessary to carry out the following work:


1. Check the unit for "three leaks" (lubricating oil, fuel oil and coolant);


2. Turn off the fuel valve;


3. Turn off the air inlet and exhaust facilities of the machine room (if necessary);


4. Turn off the generator output air switch;


5. Turn off the power key switch of the control panel, take out the key and keep it properly (if necessary);


6. When the diesel generator set is shut down for a long time or maintained, the negative pole cable of the unit starting battery must be removed, and the fuel and coolant shall be drained if necessary.




Phone: 0086-13476414254(Wechat)
Fax: 0086-0710-3386304
Email: hbxrks@aliyun.com
Web: www. hbxrks.com
Add: No.C3-2, Jiahai Industrial Park, High-tech Zone,         Xiangyang, Hubei Province, China
0086-13476414254
Scan code to add friends on Wechat

Statement: some materials come from the Internet. If there is any infringement, please tell us to delete it!